Availability & timing
Assess potential supply, connection requirements, utility studies and the relationship between energisation and development phasing.

Infrastructure
An AI-ready facility depends on more than an individual specification. Power, cooling, connectivity and delivery must work together around the intended workload.
The assessment framework
Our assessment approach connects four interdependent areas. Project-specific technical and commercial studies establish the requirements and performance targets for a development decision.
Development assessment framework01 / Power
A proposed capacity is only meaningful when there is a credible path to supplying it.
Assess potential supply, connection requirements, utility studies and the relationship between energisation and development phasing.
Evaluate power pricing assumptions and potential procurement structures as part of commercial feasibility.
02 / Systems
Evaluate cooling options against expected equipment density, water availability, energy use and maintainability.
Assess network access, potential route diversity and the resilience requirements of the intended customers.
03 / Delivery
Review location, land constraints, utility prospects and commercial fit.
Develop technical studies, cost assumptions and the approvals pathway.
Bring partners, commercial requirements and financing conditions together.
Proceed only when the project has a substantiated basis for commitment.
Development decision framework. Project schedules depend on the evidence and agreements established at each stage.
Campus design
A modular campus study connects data halls, energy, cooling and landscape in one masterplan.
Illustrative campus design. Final configuration and capacity depend on site-specific studies and approvals.
Explore the campus designWork with Starlight
Discuss an investment, development or infrastructure partnership with Starlight.
Start a conversation